Answer: It takes a day for the review. And takes no more than 7 days to issue the results of inspection and certification of energy management
Answer:
The qualifications of an energy management audit and certification are as follows:
1) Be a person or a juristic person
2) consisted of “1 expert” and “2 expert assistants”.
3) Experts have the duty to “audit and certify energy management. And prepare a report of the audit results “
4) Expert Assistant Responsible for “Assisting the Audit Expert. And help prepare the report “
5) Professionals and specialists of “inspected and certified not more than 30 locations” in each examination cycle.
6) Must not be a specialist or a specialist to the licensee. Other people at the same time
7) Must not be regular personnel of the controlled factory who visit and inspect
guarantee
8) The audit and certification of energy management in each plant must be performed by one specialist + 2 professional assistants.
duty
1) Review the energy management report
2) Prepare audit items according to the requirements.
3) To propose ideas on how to improve energy management.
4) Prepare the audit report and certification of energy management.
Answer: One or more buildings under the same house number. Where the following power is used as a controlled plant
1) Install a 1,000 kilowatt (kW) meter
2) Installed a 1,175 kV transformer (kVA).
3) Use electricity or steam heat from the supplier. Or energy consumed from the supplier or your own
Either or a combination in the past year It has an amount of energy equivalent to electrical energy 20 million MJ.
Answer: One factory or several factories under the same house number. Where the following power is used as a controlled plant
1) Install a 1,000 kilowatt (kW) meter
2) Installed a 1,175 kV transformer (kVA).
3) Use electricity or steam heat from the supplier. Or energy consumed from the supplier or your own
Either or a combination in the past year It has an amount of energy equivalent to electrical energy 20 million MJ.
Answer: The Energy Management Report must be submitted to the Director-General by March of every year.
Answer:
1) Electronic data transmission via the e-Form system specified by the Director-General.
2) Submission of original documents (report + inspection report) + CD electronic file in person or by registered mail. Hold the registration date as the report submission date.
Answer:
In the event that an area is not reached under the building control law, there are several reasons that may need to be inspected.
Such as through a factory or building There are business partners and need safety, so there is an internal audit to inspect the building to
Security etc.
The building does not qualify for the inspection or not. If the building has a lot of building occupants and has a long service life, it should be done to maintain the building continuously, such as having a building inspection every 5 years, etc. This causes damage to the life and property of the building occupants. The main cause is 1. Caused by lack of inspection 2. Lack of maintenance and 3. Lack of building maintenance.
Answer: The duration of a building inspection depends on the type and area of the building. Most inspections will end in 1 day.
Answer: Be a licensed engineer or architect. Passed building inspector training Passed the knowledge test from Council of Engineers according to criteria And can register as a building inspector with the Department of Public Works and Town Planning And have professional insurance by
There are two types of building inspector licenses for natural persons. And a license for corporate building inspector
Answer:
Penalties if the owner of the building fails to comply with the ministerial regulations, is an offense, both civil and criminal.
“Section 65 bis”
“With the punishment under Section 65 bis, imprisonment for a term not exceeding 3 months or a fine not exceeding 60,000 baht or both and both.
Another fine of 10.000 baht per day ”until an inspection is arranged. By licensees
“Section 65 quarter”
Issued under the Building Control Act 2522 (No. 3) BE 2543, Section 6 Engineer Inspector
And inspectors “whoever This violates or fails to comply with the order of the local official under Section 46 bis (on equipment
Building) shall be liable to a fine not exceeding 30,000 (thirty thousand baht), in addition to the punishment under paragraph one. Idler
According to the Code 46 bis, still liable to a further fine not exceeding 5,000 (five thousand baht) per day throughout the violation or until the
Do it right
Con Engineering Co.,Ltd.
บริษัท คอน เอ็นจิเนียริ่ง จำกัด
Con Engineering Co.,Ltd.
Village No. 9, No. 7/23, Rahaeng Subdistrict, Lat Lum Kaeo District, Pathum Thani 12140
Con Engineering Co.,Ltd.
บริษัท คอน เอ็นจิเนียริ่ง จำกัด
Con Engineering Co.,Ltd.
Village No. 9, No. 7/23, Rahaeng Subdistrict, Lat Lum Kaeo District, Pathum Thani 12140