1. Consultation on energy management system 8 steps (Pre Audit) in accordance with ministerial regulations before entering the energy management report certification (External Audit).
2. Find energy conservation measures within the organization.
3. Train personnel in the organization to have knowledge and develop their potential to be more technical. And create awareness of energy conservation

Energy conservation training services for regulated factories and buildings such as statutory energy management systems. Building energy consciousness Energy conservation techniques Measurement techniques and energy efficiency analysis. To find energy conservation measures in machinery / equipment such as air conditioning systems, compressed air systems, steam systems, etc.

We have been registered by the Department of Alternative Energy Development and Efficiency (DEDE) to be the inspector and certification of the energy management system in accordance with the law, juristic person category. With experienced professionals and teams To obtain useful audit results and can be used for improvement Energy management system for the organization actually. Review and certify legal energy management Including consulting, analysis of energy consumption for production (SEC) as a way to reduce production costs.

Provide design consulting and engineering solutions To design the most suitable (Optimum Design) and find solutions to problems with legacy systems to increase efficiency and reduce operating costs. By using computer programs to help in the analysis (Simulation Calculation and Analysis)

Design of equipment, machinery, systems and installations such as designing heat exchangers of all types. Pipe system design Design of specific machines, etc. By focusing on the correct design according to the principles of engineering by skilled engineers. Which focuses on safe design And reduce energy consumption By using the software to help analysis and design to give customers confidence in the installation and actual use.

Machine / equipment performance measurement service And find solutions to problems with legacy systems to increase efficiency According to the standards for energy saving measurement and verification Based on the IPMVP (International Performance Measurement and Verification Protocol) methodology developed by EVO (Efficiency Valuation Organization), it is a recognized standard in the energy conservation industry.

Provides inspection of the radiator system to reduce energy consumption It is the use of machinery / efficiency of the radiator And issue factory and industry standard certificates Which provides consultation and advice on factories covering all industry groups Training in the implementation of the 8-step energy management system to be correct and in accordance with the requirements of the energy management system. That must have training at least once a year on an annual basis.

Our company has signed a cooperation with Thai-German Institute (TGI) to certify machine performance for companies promoted by BOI by providing Testing Service and Calibration service, able to certify old machine performance according to the BOI announcement at 2/2546 Re: Criteria for Consideration and Approval of Importing Old Used Machinery to be Used in Promoted Projects

The company offers a service to send projects of companies that need to develop potential in technology and innovation. By the way, we have cooperated with Thai-German Institute (TGI) to procure and submit projects of interested companies to join the Technology Development and Innovation Support Program (ITAP) with a reliable team from Thai-German Institute. Counseling to join the ITAP program

Conducting a legal audit And prepare a report To send to the building owner to make corrections (In case of correction) If no correction The owner of the building Therefore send reports to local officials / building inspections as the building or factory wishes to inspect for safety


การใช้งาน: Boiler 1 – 2 ton/hr
การเพิ่มขึ้นของอุณหภูมิ: 10–25 องศาเซลเซียส
การใช้งาน: Boiler 3 – 4 ton/hr
การเพิ่มขึ้นของอุณหภูมิ: 10–25 องศาเซลเซียส
การใช้งาน: Boiler 5 – 6 ton/hr
การเพิ่มขึ้นของอุณหภูมิ: 10–25 องศาเซลเซียส
Con Engineering Co.,Ltd.
บริษัท คอน เอ็นจิเนียริ่ง จำกัด
Con Engineering Co.,Ltd.
Village No. 9, No. 7/23, Rahaeng Subdistrict, Lat Lum Kaeo District, Pathum Thani 12140
Con Engineering Co.,Ltd.
บริษัท คอน เอ็นจิเนียริ่ง จำกัด
Con Engineering Co.,Ltd.
Village No. 9, No. 7/23, Rahaeng Subdistrict, Lat Lum Kaeo District, Pathum Thani 12140